Ara Damansara Factory Repair Work 2

Project Repair Klreport - July 2022:
Ara Damansara factory repair work 2

Background story:
Mr. Lam was very satisfied with the earlier rectification work we completed previously. He further recommend us to proceed this new project.

Problems Report:
1. Roller shutter rectification work
2. Painting work at wall area

Cause / Root of Problems Report:
1. Roller shutter rectification work
The rust was formed at the roller shutter due to sun and rain exposure for a long period.

2. Painting work at wall area
The existing paint coating started peeling off due to sun and rain exposure for a long period.

Our Job Description Report:
Our service provided in this project including:
1. Removing all the rust
2. Supply & apply new painting work